# Capture Plan

We apply higher capture rate to fast-closing categories and lower to slow ones.

<div data-full-width="false"><figure><img src="https://792255475-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FGBBaT9ifDkFilJmkczO1%2Fuploads%2FFnOuxotqsrldpyBjuN9F%2Fimage.png?alt=media&#x26;token=34f62803-4482-47da-85ef-ef47ebc867be" alt=""><figcaption></figcaption></figure></div>

### By year

#### Year-1 routed by category ($1.369B total)

<figure><img src="https://792255475-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FGBBaT9ifDkFilJmkczO1%2Fuploads%2FPdrnwHyEuDBImBKZfZQt%2FCaptura%20de%20pantalla%202025-09-10%20135748.png?alt=media&#x26;token=347f3658-716f-4c52-9bd3-b5e23a470c45" alt=""><figcaption></figcaption></figure>

#### Year-3 routed by category ($2.738B total)

<figure><img src="https://792255475-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FGBBaT9ifDkFilJmkczO1%2Fuploads%2FejPpCY4EG1buOi6O1Rn9%2FCaptura%20de%20pantalla%202025-09-10%20135821.png?alt=media&#x26;token=dc24b5b2-8f32-4004-a74e-acd6cd4d84c8" alt=""><figcaption></figcaption></figure>

### Assumptions

* All figures are CAPEX flows (not OPEX, not installed base).
* Crypto rigs included conservatively; policy changes could provide upside.
* Category → countrysplits reflect sector realities: Mexico strong in  \
  data-centers/C\&I solar, Chile+Peru heavy in mining; EV-infra still small  \
  outside Brazil.
